Hello! Welcome to the official website of Dongguan Hung Mao Internet of things technology Technology Co., Ltd.
4Success case

Guangdong Provincial Games Main Stadium

Project location: Zhanjiang, Guangdong

Project time: September 2014

Project introduction:

The main venue of the Guangdong Provincial Games is located on the north side of the bridge head of the Gulf Bridge in Potou District, Zhanjiang City. The total land area of ​​the project is 664.51 mu and the total construction area is 184,700 square meters. The project consists of two parts: a three stadium and surrounding supporting road works. The construction content includes: stadium (including training ground), gymnasium, comprehensive ball hall, outdoor engineering, surrounding supporting engineering, etc. The overall design of the project runs through the theme of "streamers", highlighting the natural and smooth planning like a bay. The stadium is based on the concept of "sea shells" and "conch" as the matrix. The building is simple and pure. The gymnasium, comprehensive ball hall, swimming and diving hall are connected in series, shaped like three white shells, scattered freely on the beach, reflecting the unique architectural style of the bay city, and it is a new landmark building in Zhanjiang City. The stadium intelligent lighting control system is designed and produced by Dongguan Hongmao Internet of Things Technology Co., Ltd. with more than ten years of experience in the development and production of intelligent control systems. Absorbing the advantages of foreign intelligent control systems, while adopting the latest international electronic technology and computer network technology, the system has the characteristics of easy networking, easy management, and easy expansion. The backbone of the system adopts an Ethernet network, and at the same time, it cooperates with the unique intelligent control technology of the system's unique software and hardware to ensure the system
Regardless of the number of bus devices, the maximum and stable transmission rate can be obtained for the length of the bus.

HongMao IOT Technolgy Co.Ltd. Copyright 2018 [Back-stage management] Technical support:[mwth]